ispyisail e3cb994e0e Cascade-delete a diagram's element/element_info/terminal/conductor rows
removeDiagram() only ever deleted the diagram's own row. No foreign key in
this schema is declared ON DELETE CASCADE (and SQLite foreign-key
enforcement is never turned on for this connection anyway), so removing a
diagram left every element, element_info, terminal and conductor row that
belonged to it behind in the database -- silently, since nothing reads them
until the next full updateDB() rebuild papers over it.

Traced why this had never crashed anything: Diagram::~Diagram() explicitly
walks and deletes its top-level items through removeItem() (which does call
dataBase()->removeElement() correctly), but deliberately skips conductors --
because a conductor's destructor touches both of its terminals
(terminal1->removeConductor(this)), and those terminals may belong to an
element already destroyed earlier in the same sweep. Conductors are instead
destroyed as a side effect of Terminal::~Terminal()'s qDeleteAll() on its own
conductor list, which is a plain C++ delete that never goes through
Diagram::removeItem() and therefore never calls dataBase()->removeConductor()
at all. So the object graph is torn down safely, but the database is never
told about the conductors or their terminals.

Fixed by adding the missing bulk deletes to projectDataBase::removeDiagram()
itself, run while the diagram (and its live scene) still exist -- verified
that QETProject::detachDiagram() emits diagramRemoved() (which this class's
constructor connects to this slot) synchronously, before the Diagram object
is scheduled for destruction via deleteLater(), so nothing here races the
C++ teardown described above. Order matters: element_info and terminal have
no diagram_uuid column of their own, so both are scoped through a subquery
on element and must run before element itself is deleted.

Verified against examples/industrial.qet (50 diagrams) by calling
projectDataBase::removeDiagram() directly and comparing table counts before
and after, with no intervening updateDB() call to mask a gap:

  element=354->335 element_info=354->335 terminal=1087->1033 conductor=671->626 diagram=50->49

Every delta matches a direct SQL count for that diagram's own rows exactly
(19 elements, 54 terminals), and both "orphan rows still referencing the
removed diagram" checks read 0 afterward -- so the cascade is complete and,
just as importantly, scoped: nothing belonging to the other 49 diagrams
moved.

Separate finding, not fixed here: QETProject::removeDiagram(Diagram*) (the
synchronous, non-undoable variant, not the usual GUI
ProjectView::removeDiagram() path) segfaults if the enclosing QETProject is
destroyed before an event loop iteration lets its pending deleteLater() run
-- reproduces identically on unmodified master, so it predates and is
unrelated to this change. Worth its own report; a headless caller is the
only realistic way to hit it, which is how this surfaced.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>